Construction technology of hard polyvinyl chloride UPVC pipe
欄目:Industry News 發布時間:2021-06-03 15:19
In water well engineering, the traditional pipes used to build wells are mainly cast iron pipes, steel pipes and concrete pipes. These pipes have serious corrosion and aging problems, which have been difficult to solve. Compared with traditi...
In water well engineering, the traditional pipes used to build wells are mainly cast iron pipes, steel pipes and concrete pipes. These pipes have serious corrosion and aging problems, which have been difficult to solve. Compared with traditional well pipes, polyvinyl chloride PVC-U pipes have uniform performance, strong corrosion resistance, light weight, abrasion resistance and biological inertness, low water flow resistance, long service life, simple and rapid installation, and low cost And other distinctive features.

1 Well completion process
1.1 Preparation for well completion
(1) Correct the hole depth. After the drilling is completed, the hole depth is corrected, and the steel ruler is used to accurately measure all the drilling tools raised from the hole. The hole depth error shall not be greater than 2.
(2) Test hole. After the hole is drilled, test the hole in time to check whether the diameter of the hole meets the requirements, whether the hole is vertical and round, to ensure the smooth installation of the well pipe and the uniform thickness of the gravel. It is advisable to use a steel hole tester to test holes. The length of the hole tester is 20-30 times the diameter of the hole, and the diameter is 20mm-30mm smaller than the diameter of the hole.
Impact drilling test hole: The hole tester is connected to the end of the drill wire rope, and the hole tester can smoothly go to the bottom of the manhole. Drilling: fL I~P qualified.
Rotary drilling test hole: The hole tester is connected with the drill rod to drill the hole. While running the drilling tool, rotate the drill rod manually, and if it goes down to the bottom of the hole smoothly without any resistance, the drilling meets the requirements. Otherwise, put forward the drill bit to repair the hole until the drilling meets the requirements.
(3) Piping. According to the stratum profile divided by drilling and hydrological logging, the location of the filter pipe and the filling location of different specifications of filter materials are determined, and the actual structure of the well is compiled. The filter tube and filter material should be selected according to the aquifer particle screening data. If the prepared filter tube and filter material specifications do not match the screening data, the filter tube and filter material that meet the requirements should be replaced.
When piping, check the quality of the well pipe, carefully check the fit of the threads, and clean the threads; use a steel ruler to measure the length of each well pipe. And use a marker to number the upper and lower pipes on the well pipe according to the actual well structure drawing.
(4) Drill hole cleaning. Before the well pipe is installed, the hole depth and diameter should be accurately measured, and the hole should be cleaned. The percussion drilling hole is used to draw out the drill cuttings and thick mud that settled at the bottom of the hole with a suction tube. After the rotary drilling hole is tested, the drilling tool should be lowered to the bottom of the hole again, and the mud pump should be activated to flush the cuttings deposited at the bottom of the hole out of the hole, and the mud should be thinned out.
1.2 Well pipe installation
(1) The bottom of the sedimentation tube must be set up at the bottom. The bottom of the tube should be processed with a PVC-U board with a thickness of 20mm~30mm or made of other materials that can ensure the bottom of the seal. The bottom of the tube and the precipitation tube can be connected by plastic welding, epoxy resin bonding, mechanical riveting, etc., but it must be ensured The connection is firm and reliable.
(2) The method of direct lifting and one-off pipe down is adopted. When running down the pipe, the well pipe may float before the water filter pipe enters the water (due to the low pipe density, PVc-u well pipe density: 1.35 ~ 1.45g/cm.) sinking is difficult, you can take the well Water is injected into the pipe to increase its weight and help it sink.
(3) Set up a centralizer. In order to locate the well pipe in the center of the borehole and ensure the uniform thickness of the gravel packing, centralizers must be installed at the appropriate positions of the water filter pipe and the well wall pipe when installing the well pipe. The number of centralizers per well shall not be less than 3 (configured according to the actual well depth). The distance between centralizers is generally 30m~50m, and the diameter of centralizers is 50mm~60mm smaller than the borehole diameter. The centralizer can be made of wood, PVC—U board length should not be less than
600mm, thickness 30mm~50mm. 4 pieces of wood centralizers should be evenly distributed along the circumference of the pipe and tied firmly with iron wires; 3 pieces of UPVC centralizers should be evenly distributed along the circumference of the pipe, which can be bonded by adhesive or tied by iron wires.
Whether it is wire binding or adhesive bonding, it should be ensured that the supporting device is firm and reliable.
(4) The well pipe adopts press-formed thread. When lowering the tube, after twisting the thread to the end by hand, you must use hemp rope and wooden sticks or V-belt and wooden sticks to further tighten it.
(5) The lowering speed in the manhole under the well pipe should be uniform and slow. If you encounter obstacles during the down-pipe process, you should find the cause in time. Solutions such as moving up and down and turning the well pipe slightly clockwise, etc. can be taken, without piercing. If the treatment is invalid, the well pipe should be removed from the hole in time. It is strictly forbidden to knock with metal utensils during the lowering process.
(6) The well pipe must be lowered to the bottom of the hole, and pipe hanging is strictly prohibited. After the well pipe goes down to the bottom of the well, a spirit level should be used to measure the verticality of the well pipe and the levelness of the wellhead, and check the size of the exposed ground as required. When all the requirements are met, fix the well pipe mouth, and use the drilling rig hoist to apply tension to the well pipe (natural hanging state) before enclosing the filter material.
1.3 Gravel filling
(1) Filter material selection. The quality and specifications of the filter material should be carefully checked before gravel filling (the quality and specifications of the filter material shall be implemented in accordance with the relevant technical specifications), and the filter material that does not meet the requirements shall not be filled in the manhole. The filter media containing more soil impurities should be rinsed with water before being used. Measure the number of filter materials stored on site and calculate whether the number of filter materials meets the design requirements. The filter material preparation should be sufficient.
(2) Gravel filling. According to the characteristics of UPVC well pipes, the gravel filling method should adopt the flushing gravel filling method. According to the actual situation of the well site, the pumpless gravel packing method or air compressor reverse circulation flushing gravel packing method can also be adopted. The gravel should be filled continuously and evenly around the well pipe from the wellhead, and should not be filled from a single direction. The filling speed must not be too fast. During the gravel filling process, the position of the filter material surface in N:fL should be checked regularly. If blockage or "bridging" is found, measures should be taken to eliminate the gravel before filling. After the filter material is filled to the predetermined position, the surface of the filter material should be measured again before the water stop or external sealing of the pipe
If there is a sinking position, it should be filled to the predetermined position.
Wash the gravel. After running the pipe, lower the drill pipe from the inside of the pipe to a distance of lm~2m from the bottom of the well pipe, and take measures to close the pipe mouth, and start the water pump to inject water from the drill pipe into the well pipe. The amount of water injection shall be subject to not flushing out the filter material. After the annulus outside the pipe returned water, gravel filling began. During the gravel filling process, the flushing fluid should always be circulated and the pump should not be stopped midway.
No pump to fill gravel. Gravel packing H~: The liquid in fL should always keep overflowing from the well nozzle. If the overflow is interrupted, measures must be taken to refill the gravel until the well pipe mouth resumes overflow.
The air compressor washes the gravel in reverse circulation. The orifice should be connected to the water source when filling gravel. The flushing fluid should always circulate over the hole.
1.4 Waterstop and sealing
(1) Water stop material. Waterstop materials should meet the requirements of relevant regulations, and high-quality clay balls or cement slurry should be used. Generally, high-quality clay balls are preferred for permanent water stop. When a well is formed in a high-pressure artesian zone or there are special requirements for water stopping, cement slurry or colloidal cement slurry should be used for permanent water stopping.
(2) Clay balls stop water. The clay ball is made of high-quality clay, the diameter of the clay ball is 20mm~30mm. Let it cool and dry before use until the surface is slightly dry and the inside is moist and soft. When using clay balls to stop water, the clay balls should be filled continuously and evenly around the well pipe from the wellhead, and should not be filled from a single direction, and the speed of putting the clay balls should not be too fast. During the process of putting the clay ball, the position of the clay sphere in the hole should be detected regularly. If blockage is found, measures should be taken to eliminate it before throwing the clay earth. ’
(3) Cement slurry to stop water. When using cement slurry to stop water, it is advisable to use ordinary Portland cement or aluminum sulfate geological prospecting cement of 32.5Mpa or more. Concentrated quick-drying cement should not be used. In order to prevent the water chemical reaction heat generated by the cement slurry from affecting the UPVC well pipe If the strength is affected, 2-9 bentonite should be added to the cement slurry to eliminate the heat generated by water chemistry.
After the clay ball is filled to the predetermined position, the position of the clay sphere should be measured again before the clay backfilling and sealing outside the pipe. If there is sinking, it should be filled to the predetermined position and backfilled with clay. If you want to check the water stop effect, you can do it before backfilling.
1.5 Well wash
Well washing should be carried out after gravel filling and water-stopping clay is backfilled to the ground level, 24 hours after the procedures are completed. According to the characteristics of UPVC well pipes, sodium pyrophosphate or compressed air should be used for well washing. Pistons can also be used to wash wells.
(1) Sodium pyrophosphate washes wells. Sodium pyrophosphate or sodium hexametaphosphate should be cleaned according to relevant specifications. In order to achieve a good well cleaning effect, before cleaning the well, the mud used for drilling and the mud on the hole wall should be tested indoors, the medicament should be dosed according to the test results, and the well should be pumped and washed regularly.
(2) The compressed air well flushing shall be carried out in accordance with the relevant prescribed procedures. In order to reduce the pressure difference between the inside and outside of the well pipe, the air injection speed should be controlled.
(3) Piston washes well. If a piston is used to clean the well, the following requirements should be met: the diameter of the piston should be 20mm~30mm smaller than the inner diameter of the well tube (the steel platen should be 50mm~60mm smaller than the inner diameter of the well tube), and the length of the piston should be 80mm~100mm. The lifting speed of the piston should not be too fast, and should be controlled between 0.4 and 0.8 m/s. When using steel wire rope weighted drill rods to drive pistons to wash wells, elastic centralizers must be installed on the weighted drill rods to prevent damage to UPVC well pipes. The well is cleaned from top to bottom step by step, and the piston cannot stay in the hole for a long time.

2 Problems and countermeasures in construction
(1) Existing problems. When there is no seat at the bottom of the well during construction, the water level in the pipe will drop after the well is washed, and the mud and filter material outside the well pipe will sink and drive the lower well pipe to sink. The upper well pipe cannot follow the pressure of the backfill at the same time. When sinking, the well pipe is prone to be disconnected, causing waste wells.
(2) Countermeasures. First of all, try to place the well pipe at the bottom of the well. After the well pipe is down to the bottom of the well, the well pipe can be lifted by lm~2m again, and then the well pipe can be quickly dropped to the bottom of the well after aggravating, so that the well pipe can be seated at the bottom of the well several times . In addition, when the well pipe is installed, 4 holes can be drilled at the 1:1 position of the well pipe and anchored with screws, so that no disconnection occurs when the well pipe sinks. After the well is washed, the filter material and the backfill can be solidified. The well maintenance was successful.

Wuxi Jiahong Plastic Technology Co., Ltd. can process various filled, flame-retardant, reinforced modified ABS, PS, PC, PC/ABS, polypropylene, PA and other engineering plastic particles according to customer requirements; various automotive door panels, bumpers, dashboards , Engine cover, car lights and other automotive special materials.

Wuxi Jiahong Plastic Technology Co., Ltd. has nearly 30 years of experience in R&D and pelletizing production of PVC pellets, and experience in R&D and production of modified engineering plastics; the professional technical service team can provide customers with one-stop modified plastic system solutions. If you want to know more about the product, please log in to our official website: www.91jiajiale.cn, consult online customer service or call the hotline. Landline: 0510-68755207 Mobile: 15190220696, we will serve you wholeheartedly.
a级片免费在线观看 | 日韩在线免费av | 激情九月天 | 欧美大片免费 | 手机看片国产 | 日韩乱码人妻无码中文字幕 | 草莓视频黄版 | 成人区精品一区二区婷婷 | 可以免费看黄的网站 | 国产欧美熟妇另类久久久 | 亚洲精品成人电影 | av一区二区三区在线 | 国产成人三级一区二区在线观看一 | 射死你天天日 | 一本一道精品欧美中文字幕 | 欧美人喂奶吃大乳 | 波多野结衣网站 | 99精品视频免费看 | av不卡在线 | 国产传媒国产传媒 | 91插插插插 | 成年人性生活免费视频 | 澳门黄色网 | www.色综合| 天天舔天天插 | 麻豆成人网 | 老头老太吃奶xb视频 | 日本精品视频一区 | 亚洲欧美精品午睡沙发 | 久久久久中文 | 成人在线免费电影 | 国产精品无码在线 | 精品人妻少妇嫩草av无码专区 | 久久久免费精品 | 日本少妇性生活 | 蜜臀久久99精品久久久久久宅男 | 一区二区三区国产在线 | 久久av一区二区三区 | 久久深夜福利 | 岳乳丰满一区二区三区 | 午夜视频www | 一级黄色大片免费看 | 国产97在线视频 | 黄色片aa | 久久露脸国语精品国产91 | 国产小视频在线观看免费 | 阿v视频在线免费观看 | 高h文在线 | 污污网站在线免费观看 | 日日草视频 | www.色在线| 先锋影音av在线 | 国产一级特黄a高潮片 | 丰满的女邻居 | 91成人综合 | 欧美日韩色图 | 97人人干 | 国产一二三精品 | 日韩av在线一区二区三区 | av在线免费网站 | 中文字幕丝袜美腿 | 久草小说 | 欧美精品在线观看视频 | 亚洲精品一 | 亚洲精品偷拍视频 | 欧美大屁股熟妇bbbbbb | 精品人妻无码一区二区性色 | 欧美日韩精品 | 伊人伦理 | 日韩资源在线观看 | 91精品久久久久久综合五月天 | 精品少妇 | 国产日本精品视频 | 久久精品一区 | 亚洲AV无码久久精品国产一区 | 91n在线观看| 日韩亚洲一区二区三区 | 色婷婷久久久 | 波多野结衣无限发射 | 成人羞羞国产免费动态 | 少妇视频网 | www.精品国产| 一本色道久久综合亚洲二区三区 | 天天想你在线观看完整版高清 | 老熟妇仑乱一区二区av | 蜜臀av性久久久久蜜臀aⅴ四虎 | 精品国产aⅴ一区二区三区东京热 | 久久久久久伊人 | 精品国产乱码久久久久久闺蜜 | 日本一区二区三区四区在线观看 | 国产精品第七页 | 国产网站在线看 | 久久精品视频免费观看 | 台湾佬美性中文网 | 人人爽av| 成人在线电影网 | 手机看片一区二区 | 嫩草私人影院 | 激情宗合 | 窝窝午夜影院 | 亚州男人天堂 | 天堂资源站 | 黄色1级片 | 一级片免费网站 | 免费亚洲一区 | 日日操狠狠操 | 日本黄色片视频 | 自拍偷拍在线播放 | 韩日黄色片| 亚洲熟女乱色综合亚洲小说 | 天堂av免费 | 影音先锋久久久 | 亚洲午夜一区二区 | 国产一区二区三区在线观看视频 | 欧美又大粗又爽又黄大片视频 | 啪啪免费 | www.男人天堂.com | 国产麻豆免费观看 | 91国产视频在线观看 | 在线成人免费电影 | 美女精品 | 丰满熟女人妻一区二区三 | 爱情岛av| 激情一级片 | 一级片a级片 | 精品久久二区 | 人妻熟女一区二区三区 | 日韩视频h | 黄色小视频免费在线观看 | 精品不卡一区二区 | 在线免费日韩 | 视频一区二区在线观看 | 色综合久久久 | 人妖粗暴刺激videos呻吟 | 日韩精品在线观看视频 | 男生草女生视频 | 五月婷婷激情综合网 | 黄频在线免费观看 | 嫩草影院av | 超碰这里只有精品 | 色视频在线观看免费 | 久草最新视频 | 免费国产 | 美女黄色免费网站 | 葵司av在线 | 亚洲综合国产 | 区一区二在线观看 | 午夜影片 | 欧美日韩视频一区二区 | 精品美女 | 国产网站91| 在线色图| 免费黄色高清视频 | 成人免费视频网 | 91av欧美 | 久久人人爽人人爽 | 成人小视频免费 | 在线观看污视频网站 | 成人夜晚看av| 中文字幕高清在线观看 | 大香依人| 丝袜美女av | 96在线视频| 日韩xxx高潮hd | 91亚洲精品乱码久久久久久蜜桃 | 美女黄色真播 | 美女91网站 | 亚洲欧美日本在线观看 | 超碰在线c | 亚洲熟妇无码av | 亚洲av成人无码久久精品 | 天天玩天天干 | 亚洲 欧美 视频 | av激情小说 | 日韩av电影网站 | 波多野结衣理论片 | 七七久久| 国产精品一区二区免费视频 | 摸bbb搡bbb搡bbbb | 一卡二卡三卡四卡五卡 | 自拍偷拍五月天 | 四虎av网站| 久草新视频 | 天堂福利视频 | 女同av网站 | 欧美色哟哟| 国内自拍99 | 最新av免费| 久久精品午夜 | 粉嫩aⅴ一区二区三区四区五区 | 日韩欧美一区在线 | 51免费看成人啪啪片 | 青草综合 | 男人天堂新地址 | 亚洲影视一区 | 欧美另类69 | 精品国产制服丝袜高跟 | 老鸭窝视频在线观看 | 国产五月婷婷 | 三级av网 | 国产成人在线精品 | 污污内射在线观看一区二区少妇 | 久久精品国产亚洲av高清色欲 | 内射中出日韩无国产剧情 | 天堂影院av| 中日韩精品视频 | 波多在线观看 | 黄色网免费看 | 亚洲精品一区二区18漫画 | 国产精品国产精品国产专区不卡 | 欧美一区二区精品 | 欧美三级免费看 | 久久免费视频99 | 亚洲久久一区 | 国产69精品久久 | 亚洲精品日韩精品 | 国产青青青 | 波多野结衣中文字幕一区二区三区 | av中文字幕一区 | 永久免费视频 | 久久精品一区二区免费播放 | 日批网址| 中日韩精品一区二区三区 | 在线黄av | 色小说香蕉 | 天天艹日日干 | 天堂网亚洲| 久久精品国产欧美亚洲人人爽 | 少妇荡乳情欲办公室456视频 | 中文字幕韩日 | 亚洲成人av免费在线观看 | 30一40一50女人毛片 | 久久久美女视频 | 亚洲九区| 日韩精品电影一区二区 | 久久裸体视频 | 精品一区二区国产 | 色欲欲www成人网站 一级黄色性片 | 无码精品人妻一区二区三区影院 | 免费av影视| 少妇一级淫片免费观看 | 欧美日韩国产三区 | 日本黄色视 | 日韩一级片视频 | 日韩裸体视频 | 中文字幕一区二区三区在线不卡 | 国产91在线播放精品91 | 丰满熟妇人妻中文字幕 | 特级毛片av| 亚洲乱色 | 中文字幕人妻无码系列第三区 | 久久精品二区 | 日本中文字幕在线免费观看 | 最新日韩在线 | 天天插夜夜 | 大香伊人中文字幕精品 | 午夜久久久久久 | 亚洲成人二区 | 伊人久久五月天 | 欧美激情精品久久久久久 | 日韩看片 | 18在线观看视频 | 99热在线观看 | 爽视频 | 一个色的综合 | 久久综合亚洲色hezyo国产 | 少妇视频一区 | 乱短篇艳辣500篇h文最新章节 | 日韩三级在线免费观看 | 在线免费观看中文字幕 | 日韩淫片| 国产欧美大片 | 这里只有久久精品 | 日韩精品卡通动漫网站 | 一卡二卡国产 | 久久久久久久久久久久久久久久久久 | 五月天色网站 | 欧美99 | 久久伊人五月天 | 岛国成人在线 | 成人亚洲精品777777ww | 特黄aaaaaaaaa真人毛片 | 久久婷五月 | 一级色片 | 国产精品精品久久久久久 | 国产精品一区二区视频 | 亚洲无人区码一码二码三码的含义 | 日韩大尺度视频 | 色综合五月天 | 少妇高潮一区二区三区四区 | 女人下部全棵看视频 | 欧美黄色大全 | 国产视频精品一区二区三区 | 日日操影院 | 伊人免费在线观看 | 裸尼姑熟蜜桃 | 亚洲春色另类 | 日日夜夜av | av中文字幕观看 | 欧美一级淫 | 亚洲精品va | 三级a做爰全过程 | 亚洲国产二区 | 日韩欧美一区二区三区在线 | 狂野欧美性猛交blacked | 91私密视频 | 亚洲精品视频免费 | www.精品国产 | 伊人www | 91手机视频在线观看 | 亚洲av综合色区无码一二三区 | 欧美资源站| 黄色成年人网站 | 久久久视频在线观看 | 依依激情网 | 男人与雌宠物交h | 国产欧美激情 | 四虎成人精品在永久免费 | 欧洲性xxxx | www.亚洲.com| 影音先锋中文字幕在线播放 | 一区二区三区四区在线观看视频 | 西西444www无码大胆 | 欧美激情16p| 一级片在线视频 | 免费网站av | 色婷婷伊人 | 性生生活性生交a级 | 中文字幕在线日本 | 樱桃视频app看片 | 一区二区三区四区在线观看视频 | 免费国产高清 | 色播视频在线观看 | www.一区二区 | 一区二区三区www污污污网站 | 激情视频一区二区 | 精品无码久久久久久国产 | 久久只有这里有精品 | 免费看的黄色 | 国产乱子伦精品视频 |